Do I need planning permission for my project?
+
It depends on what you are building, its size and position, your property and what has been done to it previously, and listed buildings and conservation areas have tighter rules. We will give you an initial view on the free site visit, and where an application is required we can prepare and submit it on your behalf.
What is the difference between planning permission and building regulations?
+
Planning is about whether you may build it: size, appearance, use and impact. Building regulations are about how it must be built - structure, drainage, damp proofing, insulation, ventilation, fire safety and access. A project can need one, both or neither, and they are approved by different processes.
Do you submit the planning application for me?
+
Yes, on notifiable work we submit planning applications on your behalf with the drawings and information required, and we deal with the queries that come back rather than passing them to you.
Which stages does building control inspect?
+
Typically commencement, the open excavation, the poured foundation, damp proof course and floor construction, drainage before backfill, structural work such as beams and roof structure, insulation before it is covered, and completion. We book and attend them, and the work stays open until it has been seen.
What happens if work was covered up before an inspection?
+
It usually has to be opened up so it can be seen: excavating a trench, cutting out plaster or lifting a floor. That is exactly why we book inspections at the right point in the programme rather than treating them as an interruption.
How long does a planning application take?
+
Determination periods are set by the local authority and are commonly around eight weeks for a householder application, though queries, consultations and requests for further information extend that. We factor a realistic allowance into the programme rather than assuming the fastest possible outcome.
Can you help with work a previous owner never got signed off?
+
We can look at it and tell you honestly what we can see, what would need opening up to establish, and what putting it right involves. Sometimes there is a regularisation route; sometimes work needs correcting. Ignoring it until a sale is under way is the worst option.
Do you work with my architect and structural engineer?
+
Yes, routinely. We build to their drawings, hold their details on site and follow them, and get queries answered quickly. Where you have not appointed a design team yet, we can tell you what will need designing and calculating before work can start.
Can you arrange a structural warranty?
+
Yes, on new builds. It is much simpler to arrange at the start, because providers want evidence collected as the build progresses. Warranties matter for self-build finance, mortgage lending and future sale.
What paperwork will I have at the end?
+
Planning permission and approved drawings where applicable, the building control completion certificate, the structural engineer's calculations and drawings, electrical and gas certificates for specialist work, drainage test results where required, and warranty documentation where one was arranged. We hand it all to you.
Which areas do you cover?
+
All of Cornwall and Devon as far as Exeter, from our base at Horningtops just outside Liskeard: including Liskeard, Callington, Menheniot, Dobwalls, St Ive, Looe, Saltash, Torpoint, Bodmin, Launceston, Fowey, St Austell and Tavistock.