CC Construction Ltd - Quality Construction. No Compromise.

Building Control & Planning Support

Building Control & Planning Application Support

Applications submitted, inspections booked and attended, and every notifiable stage signed off before it is covered, so the paperwork is complete when your solicitor asks for it. Free site visit and quote.

  • Planning applications submitted on your behalf
  • Inspections booked and attended by us
  • Structural warranty can be arranged on new builds

20 years

Hands-on construction experience

£5m

Public liability cover

£10m

Employers' liability cover

15–25

People on the books

CPCS & SMSTS

Certificated plant & site management

Service Overview

The administration that decides whether your building work counts

Building work either has the approvals and sign-offs to prove it was done properly, or it does not. Notifiable work without building control completion is a problem that surfaces years later: at sale, at remortgage, at letting, at insurance renewal - and correcting it retrospectively is far harder and dearer than doing it in the right order.

On notifiable jobs we handle this side ourselves rather than leaving it with you. That means submitting the planning application on your behalf where one is needed, notifying building control before work starts, booking and attending the inspections at each stage, holding the structural engineer's details on site and following them, and getting the completion certificate at the end.

We work directly with architects, designers and structural engineers, and where you have come to us early without a design team we can tell you what will be needed before anybody digs. A structural warranty can be arranged on new builds.

What's included

  • Planning applications submitted on your behalf
  • Building control notifications and inspections
  • Sign-off at each stage of the build
  • Working with your architect or designer
  • Engineer's details coordinated on site
  • Structural warranty can be arranged on new builds

Who it's for

  • Homeowners extending, converting or altering a property
  • Self-builders who do not want to run the approvals process themselves
  • Buyers of properties where previous work was never signed off
  • Developers and landowners needing consents and inspections managed across plots
  • Anyone working with an architect who needs a contractor to coordinate on site

When it's needed

  • You are planning an extension, new build, conversion or structural alteration
  • You are not sure whether the work needs planning permission or falls under permitted development
  • Work is notifiable and building control has to be involved
  • A structural engineer's details need coordinating on site
  • Previous work has no sign-off and it is holding up a sale or remortgage

Why It Matters

What unapproved and uninspected work costs

A sale that stalls

Conveyancing solicitors ask for planning consents and building control completion certificates. Missing paperwork on an extension or structural alteration delays sales, reduces offers and sometimes requires an indemnity policy or retrospective application.

Work that has to be opened back up

Foundations, drainage, damp proof courses and structural work are inspected at specific stages. Covering them before the inspection means excavating, cutting out or removing finished work so it can be seen.

Enforcement and retrospective applications

Building beyond what planning permitted, or without permission where it was needed, can bring enforcement attention. Retrospective applications are refusable, and the fallback is alteration or removal.

Insurance and mortgage problems

Insurers and lenders can take a view on unapproved structural work. That is a poor position to discover when you are trying to remortgage or make a claim.

Design details that never got followed

An engineer's calculation is only worth something if the beam, padstone and bearing on site match it. Where nobody coordinates that, you have a certificate describing a building you do not have.

Warranty evidence gathered too late

Structural warranty providers want evidence collected as the build progresses. Deciding you need one after the foundations are covered makes it far harder to arrange.

Common mistakes we're asked to put right

  • Assuming permitted development applies without checking, especially on extended, listed or conservation-area properties
  • Starting notifiable work without notifying building control first
  • Backfilling or plastering over work before the relevant inspection
  • Treating the engineer's drawings as a guide rather than a specification
  • Losing the certificates, then needing them at sale
  • Leaving the warranty decision until the end of the build

Our Process

How the job runs, step by step

Every job follows the same order, so you always know what has happened and what comes next.

  1. Step 1

    Free site visit and assessment

    Calum visits, looks at the property and what you want to do, and gives an initial view of whether planning is likely to be needed and what building control will want to inspect.

  2. Step 2

    Design team coordinated

    We work with your architect, designer and structural engineer, or advise on what needs designing and calculating before anything can be submitted or built.

  3. Step 3

    Planning application submitted

    Where permission is required, the application is prepared and submitted on your behalf, with the drawings and information the authority needs, and we deal with queries as they come back.

  4. Step 4

    Building control notified before work starts

    The notification goes in before we break ground, the inspection stages are identified, and the engineer's details and approved drawings are on site from day one.

  5. Step 5

    Stage inspections booked and attended

    Foundations, drainage, damp proof course, structural work, insulation and other applicable stages are booked at the right time and attended by us, with the work left open until it has been seen.

  6. Step 6

    Testing, certification and evidence

    Drainage air tested where required, specialist trade certificates collected, and evidence gathered as the build progresses for warranty purposes where a warranty is being arranged.

  7. Step 7

    Completion certificate and handover

    Final inspection cleared, completion certificate obtained, and the paperwork handed to you, which is what your solicitor, lender or insurer will ask for later.

What You Get

The difference this makes on your building control & planning support job

You are not running the process

Applications, notifications, bookings and inspection attendance are handled by us rather than added to your list.

Inspections happen at the right moment

Work stays open until it has been seen, so nothing has to be excavated or cut out to satisfy an inspector afterwards.

Paperwork complete at the end

Completion certification and trade certificates collected and handed over, the documents that matter at sale, remortgage and letting.

Engineer's details actually followed on site

Beams, padstones, bearings, reinforcement and fixings match the calculations, because the drawings are on site and coordinated.

Planning risk identified early

Permitted development, conservation area and listed building issues are raised at the visit rather than discovered mid-build.

Structural warranty available

A structural warranty can be arranged on new builds, with the evidence collected as the build progresses rather than reconstructed later.

Works with your architect

We build to other people's drawings routinely and coordinate their details, so design intent survives contact with the site.

One contractor accountable

The same contractor doing the work handles the approvals for it, so there is no gap between what was approved and what was built.

In Detail

Building control and planning support in detail

Planning permission and permitted development

Whether work needs planning permission depends on what you are building, its size and position, the property itself and what has been done to it before. Extensions, new dwellings, outbuildings, conversions and changes of use all sit in different places, and listed buildings, conservation areas and properties with existing extensions or removed permitted development rights have tighter constraints. Assuming rather than checking is the expensive route. Where an application is needed we prepare and submit it on your behalf with the required drawings and information, and deal with the queries that come back.

Building regulations and notifiable work

Planning and building regulations are two separate things, and work can need one, both or neither. Building regulations cover how the work is built: structure, drainage, damp proofing, insulation, ventilation, fire safety, stairs and safe access. Extensions, new builds, conversions, structural alterations, new drainage, roof work and much internal alteration are notifiable. We notify building control before work starts, so the inspection stages are set out from the beginning rather than caught up with halfway through.

The inspection stages we book and attend

The exact stages depend on the project, but on most jobs they include:

  • Commencement, notification before work starts on site
  • Excavation: the open foundation trench, before any concrete is poured
  • Foundation, the poured foundation before building off it
  • Damp proof course and floor slab construction
  • Drainage: installation before backfilling, plus air testing where required
  • Structural work: beams, lintels, openings, roof structure and restraint
  • Insulation and thermal elements before they are covered
  • Completion, final inspection and the completion certificate

Working with architects, designers and engineers

We build to other people's drawings as a matter of routine, and we would rather be involved early enough to flag buildability issues than be handed a finished design with a problem in it. On site the structural engineer's details are held and followed: beam sizes and bearings, padstones, reinforcement schedules, cover, strapping and restraint - and where what we uncover in the ground differs from the design assumption, we stop and have it reviewed rather than adapting it ourselves. Queries go back to the design team quickly, because a query sitting unanswered for a fortnight is a fortnight of programme.

Structural warranties on new builds

A structural warranty can be arranged on new builds, and it is worth deciding on at the start. Warranty providers inspect and want evidence collected as the build progresses: foundations, structure, drainage and weatherproofing - so the decision is much simpler before the ground stage than after it. Warranties matter for self-build finance, for mortgage lending on a newly built property, and for any future sale within the warranty period, so it is not an administrative detail to leave until the end.

Properties with unapproved previous work

We are regularly asked to look at properties where earlier work was never signed off, an extension with no completion certificate, a removed wall with no evidence of a beam, a converted garage with no approvals. The honest answer varies: sometimes a regularisation route exists, sometimes work has to be opened up so it can be inspected, and sometimes it needs correcting. What does not work is ignoring it and hoping it stays quiet until after a sale. We will tell you what we can see, what would need opening up to establish, and what putting it right involves.

Records, certificates and what to keep

At the end of a project you should hold the planning permission and approved drawings, the building control completion certificate, the structural engineer's calculations and drawings, electrical and gas certificates for the specialist work, drainage test results where applicable, and warranty documentation where a warranty was arranged. We hand these over rather than filing them ourselves, because you are the one who will be asked for them: often years later, by a solicitor working to a deadline.

Homeowners, self-builders, developers and commercial clients

For homeowners the value is simply not having to run the process while holding down a job. Self-builders often need advice earlier: on what to design, calculate and apply for before any work can start. Developers need consents and inspections managed across multiple plots to a programme, with evidence for warranties and sales. Commercial clients bring additional considerations around use, access and fire safety. We handle this side of the work across Cornwall and Devon as far as Exeter, as part of the building work we carry out.

FAQs

Building Control & Planning Support questions we get asked most

If your question isn't here, ring Calum and ask, a straight answer costs nothing.

Do I need planning permission for my project?

It depends on what you are building, its size and position, your property and what has been done to it previously, and listed buildings and conservation areas have tighter rules. We will give you an initial view on the free site visit, and where an application is required we can prepare and submit it on your behalf.

What is the difference between planning permission and building regulations?

Planning is about whether you may build it: size, appearance, use and impact. Building regulations are about how it must be built - structure, drainage, damp proofing, insulation, ventilation, fire safety and access. A project can need one, both or neither, and they are approved by different processes.

Do you submit the planning application for me?

Yes, on notifiable work we submit planning applications on your behalf with the drawings and information required, and we deal with the queries that come back rather than passing them to you.

Which stages does building control inspect?

Typically commencement, the open excavation, the poured foundation, damp proof course and floor construction, drainage before backfill, structural work such as beams and roof structure, insulation before it is covered, and completion. We book and attend them, and the work stays open until it has been seen.

What happens if work was covered up before an inspection?

It usually has to be opened up so it can be seen: excavating a trench, cutting out plaster or lifting a floor. That is exactly why we book inspections at the right point in the programme rather than treating them as an interruption.

How long does a planning application take?

Determination periods are set by the local authority and are commonly around eight weeks for a householder application, though queries, consultations and requests for further information extend that. We factor a realistic allowance into the programme rather than assuming the fastest possible outcome.

Can you help with work a previous owner never got signed off?

We can look at it and tell you honestly what we can see, what would need opening up to establish, and what putting it right involves. Sometimes there is a regularisation route; sometimes work needs correcting. Ignoring it until a sale is under way is the worst option.

Do you work with my architect and structural engineer?

Yes, routinely. We build to their drawings, hold their details on site and follow them, and get queries answered quickly. Where you have not appointed a design team yet, we can tell you what will need designing and calculating before work can start.

Can you arrange a structural warranty?

Yes, on new builds. It is much simpler to arrange at the start, because providers want evidence collected as the build progresses. Warranties matter for self-build finance, mortgage lending and future sale.

What paperwork will I have at the end?

Planning permission and approved drawings where applicable, the building control completion certificate, the structural engineer's calculations and drawings, electrical and gas certificates for specialist work, drainage test results where required, and warranty documentation where one was arranged. We hand it all to you.

Which areas do you cover?

All of Cornwall and Devon as far as Exeter, from our base at Horningtops just outside Liskeard: including Liskeard, Callington, Menheniot, Dobwalls, St Ive, Looe, Saltash, Torpoint, Bodmin, Launceston, Fowey, St Austell and Tavistock.

Related Work

Services that usually go with this one

Most jobs cross more than one trade. Taking them together keeps the programme and the price tighter.

Get a free building control & planning support quote from someone who's walked the ground

Calum will come out, look at the site and give you a straight price: fixed, cost-plus or labour-only, whichever suits the job. No deposit normally required, and stage payments as work is completed.

  • Planning applications submitted on your behalf
  • Inspections booked and attended by us
  • Structural warranty can be arranged on new builds
Request a Free Quote Call 07770 946179

Mon–Sat, 7:30am – 6:00pm

Ready to get your project moving?

Send us the details and Calum will come out, look at the ground and give you a straight, free quote: fixed price, cost-plus or labour-only, whichever suits the job.

Request a Free Quote Call 07770 946179

Mon–Sat, 7:30am – 6:00pm

Call NowFree Quote