CC Construction Ltd - Quality Construction. No Compromise.

Landscaping

Landscaping & Garden Works Across Cornwall

Levels, drainage and retaining sorted before anything is laid: patios, drives, walls and gardens built on properly prepared ground by a groundworks contractor. Free site visit and quote.

  • Groundworks-grade preparation under every surface
  • Our own plant and CPCS-carded operators
  • £5m public liability, £10m employers' liability

20 years

Hands-on construction experience

£5m

Public liability cover

£10m

Employers' liability cover

15–25

People on the books

CPCS & SMSTS

Certificated plant & site management

Service Overview

Hard landscaping is groundworks with a nice surface on top

A patio, drive or retaining wall lasts or fails for the same reasons a slab does: how well the ground was prepared, whether the sub-base was compacted to the right depth, whether water has somewhere to go, and whether anything holding back a change in level was actually designed to do it. The paving is the visible five per cent.

That is why we approach landscaping as a groundworks contractor. We have the machines to shape a site, the experience to know what Cornish ground and Cornish rain will do, and we install the drainage ourselves: so the falls, gullies, channel drains and soakaways are part of the design rather than an afterthought when water starts pooling.

We build patios, paths, driveways, hard standings, steps, retaining walls, fencing and boundaries, and we shape, level and turf ground, either as the finishing stage of a build we have carried out, or as a standalone garden project.

What's included

  • Patios, paths and paving
  • Driveways and hard standings
  • Retaining walls and steps
  • Ground shaping, levelling and turfing
  • Fencing and boundaries
  • Site finishing after a build

Who it's for

  • Homeowners wanting a patio, drive, steps or garden reworked
  • Clients finishing off a new build or extension externally
  • Owners of sloping gardens needing levels and retaining sorted
  • Anyone with standing water, run-off or an eroding bank
  • Farms and businesses needing hard standings, tracks and yards

When it's needed

  • A garden is unusable because of levels, drainage or overgrowth
  • A patio or drive is sinking, cracked, weedy or holding water
  • A bank or retaining wall is slipping, bulging or leaning
  • Building work is finished and the outside needs completing
  • Surface water is running towards the house rather than away from it

Why It Matters

What goes wrong when the ground stage is skipped

Paving that sinks and rocks

Slabs laid on sand over uncompacted ground, or a drive with a sub-base too thin for the vehicles using it, will settle unevenly. Relaying it costs more than building it properly did.

Water directed at the house

New hard surfaces shed far more water than lawn. Laid with the fall towards the building, or with no drainage, they push run-off against the wall, which becomes damp inside and saturated ground around the foundations.

Retaining walls that move

A wall holding back a bank without a designed footing, reinforcement or drainage behind it accumulates water pressure until it leans, cracks and eventually fails. On a Cornish slope that is a safety issue, not just a cosmetic one.

Steps and levels that are unsafe

Inconsistent riser heights, no going, and steps built to whatever the ground did are a trip hazard people live with for years and then trip on once.

Standing water and dead lawn

Ground compacted by machines and construction traffic, then simply turfed over, will not drain. The result is a lawn that is waterlogged all winter and dies back every summer.

Weeds and joints breaking down

Paving without proper jointing, edge restraint and a permeable build-up loosens up, weeds take the joints and blocks start to spread and shift.

Common mistakes we're asked to put right

  • Laying paving on sand over topsoil with no compacted sub-base
  • Setting a patio level with, or above, the damp proof course
  • Ignoring where the extra run-off from a new hard surface will go
  • Building a retaining wall with no drainage or footing design behind it
  • Turfing over ground compacted by construction traffic without cultivating it
  • Leaving edge restraint out of paths, drives and paving

Our Process

How the job runs, step by step

Every job follows the same order, so you always know what has happened and what comes next.

  1. Step 1

    Free site visit and levels checked

    We look at the existing levels, where water currently goes, the ground conditions, access for plant and materials, and what you want the space to do. Free visit, fast quote.

  2. Step 2

    Design, materials and price agreed

    Layout, levels, falls, drainage, retaining requirements and materials agreed and priced: fixed price, cost-plus or labour-only. Stage payments, no deposit normally required.

  3. Step 3

    Clearance and excavation

    Existing surfaces broken out, vegetation cleared, ground excavated to formation depth, and topsoil stripped and stockpiled for reuse in the finished garden.

  4. Step 4

    Drainage, retaining and sub-base

    Drainage, gullies, channel drains and soakaways installed, retaining structures built with drainage behind them, then sub-base laid and compacted in layers to a depth suited to the use.

  5. Step 5

    Laying and building

    Paving, drives and paths laid to the set falls on the correct bedding, with edge restraint, consistent joints and steps built to even risers. Walls and fencing built to line and level.

  6. Step 6

    Soft landscaping and finishing

    Ground shaped and graded, stockpiled topsoil returned and cultivated, turf or seed laid, planting areas prepared, and boundaries completed.

  7. Step 7

    Check over and handover

    Falls checked with water where it matters, joints finished, drainage tested, site cleared of debris and surplus material, and the garden handed back usable.

What You Get

The difference this makes on your landscaping job

Surfaces that stay where they were laid

Compacted sub-base to the right depth for the use, with edge restraint, so paving does not sink, rock or spread.

Water taken away from the house

Falls, gullies, channel drains and soakaways designed in by the people who also install drainage for a living.

Retaining that holds

Footings, reinforcement and free-draining backfill with a land drain behind, so banks and level changes stay put.

Sloping gardens made usable

Our own machines shape and terrace ground properly, turning a bank into space you can actually use.

Safe, even steps and paths

Risers and goings set out consistently rather than following whatever the ground happened to do.

Lawns that drain

Compacted construction ground broken up and cultivated, with your own stockpiled topsoil returned before turfing.

One contractor to finish the build

External works completed by the same team that did the groundworks, so thresholds, levels and drainage all tie together.

Fully insured, properly equipped

£5m public liability, £10m employers' liability and Contractors' All Risks cover, with CPCS-carded operators on our own plant.

In Detail

Landscaping and external works in detail

Patios, paths and paving

The build-up matters more than the slab choice: excavation to formation, compacted sub-base at a depth suited to the use, then a full mortar bed for natural stone and concrete paving or a laying course for block paving. Falls are set out away from the building, typically shedding water to a channel drain, gully or permeable area - and the finished level is kept clear of the damp proof course, which is one of the most common faults we are asked to correct. Joints are filled with the appropriate mortar or jointing compound, and edges are restrained so nothing creeps.

Driveways and hard standings

A drive carries vehicle loads, so sub-base depth is set for the traffic, not for the surface. We build in block paving, concrete, tarmac-ready formations, gravel with a stabilising layer, and reinforced concrete for farm and commercial hard standings. Edge restraint is essential wherever wheels can run over the edge. Crossfalls, channel drains and linear drainage take water off, and where the drive is at the bottom of a slope we intercept run-off before it reaches the property. Dropped kerbs and highway-facing work are dealt with in line with the requirements that apply.

Retaining walls, banks and terracing

Cornish gardens fall. Making them usable means holding ground back safely: a designed footing, block, brick, stone or reinforced concrete construction to suit the height and load, free-draining granular backfill, a land drain behind the wall taking water to an outlet, and weep holes where they belong. Height and surcharge determine whether the engineer needs to design it, and on anything significant we get that done properly. Terracing a slope into two or three usable levels often gives far more usable garden than trying to keep one continuous fall.

Steps, ramps and level changes

Steps are built with consistent riser heights and adequate goings, on proper foundations, with falls that shed water off the treads rather than let it sit and ice. Where access matters we build ramps at a usable gradient with a non-slip finish and handrail provision. Level changes between a house threshold, a patio and a lawn are set out so surface water always has a route away from the building, and so nobody has to negotiate an unexpected single step.

Drainage in the garden

Because drainage is one of our core trades, external drainage is designed rather than bolted on:

  • Channel and linear drainage across drives, thresholds and patios
  • Gullies, ACO channels and grates connected to a proper discharge point
  • Soakaways sized to the hard surface area draining into them, sited clear of buildings
  • Land drains and cut-off drains to intercept run-off from higher ground
  • Permeable build-ups where discharge has to be limited
  • Rainwater downpipe connections and existing surface water repairs

Ground shaping, topsoil and turfing

Machine work shapes and grades ground into usable falls, then the soft landscaping stage decides whether it grows. Construction traffic compacts subsoil badly, so it is broken up and cultivated rather than simply covered. Topsoil stripped at the start of the project is returned and spread to an adequate depth, graded to the finished levels and prepared before turf is laid or seed sown. Turf is laid on a prepared bed, staggered and rolled, with the edges cut in; where a lawn will get heavy use or sits on wet ground, land drainage goes in first.

Fencing, boundaries and finishing

We install post and rail, close board, panel and stock fencing, gates, and boundary walls, with posts set to a depth that suits the height and exposure, Cornish wind takes down under-set fencing regularly. Boundary work also means being clear about the line: where a boundary is uncertain we would rather establish it with you before building than move a fence afterwards. Finishing includes clearing debris, removing surplus material, sweeping and jointing paving, and leaving the property clean.

Domestic gardens, developer plots and commercial work

Domestic garden work is careful, tight-access work with small plant, protection of the house and surfaces and consideration for neighbours. Developer plots need consistent, repeatable external works completed to a programme and to the levels the drainage was designed around. Commercial and agricultural external works are about loadings, drainage and durability: yards, tracks, parking and hard standings that take heavy machinery. We take on all three across Cornwall and Devon as far as Exeter.

FAQs

Landscaping questions we get asked most

If your question isn't here, ring Calum and ask, a straight answer costs nothing.

How much does a new patio or driveway cost?

It depends on area, the depth of excavation and sub-base needed, the materials chosen, access for plant and materials, and how much drainage or retaining is involved. We look at the levels and the ground first, then quote fixed price, cost-plus, or labour-only. Site visits and quotes are free.

Why does my patio hold water?

Almost always because it was laid flat, or with the fall running the wrong way, and with no drainage outlet. We can lift and re-lay to proper falls, and install channel drainage or a soakaway at the same time since we install drainage ourselves.

How long does a landscaping project take?

A patio or path is often three to seven days; a drive one to two weeks; a full garden with retaining, drainage, steps and turfing typically two to four weeks. Retaining walls and drainage add time, and wet weather affects groundwork more than laying.

Can you build a retaining wall for a sloping garden?

Yes, and properly: with a designed footing, free-draining backfill and a land drain behind it. Where the height and load require it, we get the wall designed by an engineer. Retaining walls built without drainage are the ones that lean and end up being rebuilt.

Can you level or terrace a steep garden?

Yes. We have our own excavators and dumpers, so we can cut, fill and terrace a slope into usable levels, retaining where needed. Cut and fill within the site keeps costs down compared with carting material away and importing fill.

Will a new driveway need planning permission or drainage?

Surface water from a new hard surface has to be dealt with, either with a permeable build-up or by draining to a soakaway or suitable discharge point rather than out onto the highway. We design that in, and we will flag anything on your project that needs permission or highway involvement.

Do you lay turf and prepare planting areas?

Yes. Compacted ground is broken up and cultivated, topsoil stripped at the start is returned and graded, and turf is laid on a prepared bed or seed sown. Where a lawn sits on wet ground we put land drainage in first, otherwise it will be waterlogged every winter.

Can you fit fencing and gates?

Yes: post and rail, close board, panels, stock fencing and gates, with posts set to a depth suited to the height and the exposure. Cornish wind takes down under-set fencing regularly, so we do not skimp on that.

Can you finish off the outside after building work?

That is a lot of what we do. Because the same team did the groundworks and drainage, the external levels, thresholds and gullies were planned together, so the drive and patio tie in properly rather than being worked around afterwards.

Which areas do you cover for landscaping?

All of Cornwall and Devon as far as Exeter, from our yard at Horningtops just outside Liskeard: including Liskeard, Menheniot, Dobwalls, St Ive, Callington, Looe, Saltash, Torpoint, Bodmin, Launceston, Fowey, St Austell and Tavistock.

Related Work

Services that usually go with this one

Most jobs cross more than one trade. Taking them together keeps the programme and the price tighter.

Get a free landscaping quote from someone who's walked the ground

Calum will come out, look at the site and give you a straight price: fixed, cost-plus or labour-only, whichever suits the job. No deposit normally required, and stage payments as work is completed.

  • Groundworks-grade preparation under every surface
  • Our own plant and CPCS-carded operators
  • £5m public liability, £10m employers' liability
Request a Free Quote Call 07770 946179

Mon–Sat, 7:30am – 6:00pm

Ready to get your project moving?

Send us the details and Calum will come out, look at the ground and give you a straight, free quote: fixed price, cost-plus or labour-only, whichever suits the job.

Request a Free Quote Call 07770 946179

Mon–Sat, 7:30am – 6:00pm

Call NowFree Quote